cacao — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
Missing requirements
This is to document my comments at the meeting. I see 4 requirements missing from the slides that got talked about:
Vendor independent interoperability
Agile
break the CACAO work into phases an get minimum viable product out sooner rather than later, rather than a complete standard taking much
more time
Use other standards when possible
Give feedback to other standards if they are missing something CACAO needs (specifically OpenC2 as the command and control language is new and needs
use cases like CACAO to move to it s next phases). Point being (1)use other standard if possible. (2)If it s not possible, see other standard can be changed so it is possible before inventing a new way.
I would like to see these included in the meeting notes as brought up as potentially missing from base set of requirements presented. I m not sure process on reaching consensus on the ones presented or on
these additions (no objections?).
Duncan Sparrell
sFractal Consulting LLC
iPhone, iTypo, iApologize
I welcome VSRE emails. Learn more at http://vsre.info /
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]