[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: RE: [energyinterop] [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706: OptOut equivalent in IRC model includes: economic, emergency, must run, not participating, outage run status, override status, participating.
Ok, so what can be said is I opt-in or I opt-out. Spec only identifies
Opt-out.
Bruce Bartell
Xtensible Solutions
Mobile: +1.321.258.6500
bbartell@xtensible.net | www.xtensible.net
-----Original Message-----
From: OASIS Issues Tracker
[mailto:workgroup_mailer@lists.oasis-open.org]
Sent: Monday, November 22, 2010 1:31 PM
To: energyinterop@lists.oasis-open.org
Subject: [energyinterop] [OASIS Issue Tracker] Commented:
(ENERGYINTEROP-201) Line 706: OptOut equivalent in IRC model includes:
economic, emergency, must run, not participating, outage run status,
override status, participating.
[
http://tools.oasis-open.org/issues/browse/ENERGYINTEROP-201?page=com.atl
assian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedComment
Id=23623#action_23623 ]
Toby Considine commented on ENERGYINTEROP-201:
----------------------------------------------
Opt-in rights, Opt-Out rights, et al. are conditions of the Agreement
(and its "sub-class" Program), and as such are outside the scope of this
agreement. Constellation, at least, has publicly demonstrated user
interfaces to support both opt-in and opt-out.
Energy Interop makes no assumptions about what it is apropriate to say,
or what agreements should say, just what can be said.
> Line 706: OptOut equivalent in IRC model includes: economic,
emergency, must run, not participating, outage run status, override
status, participating.
>
------------------------------------------------------------------------
------------------------------------------------------------------------
-------
>
> Key: ENERGYINTEROP-201
> URL:
http://tools.oasis-open.org/issues/browse/ENERGYINTEROP-201
> Project: OASIS Energy Interoperation TC
> Issue Type: Improvement
> Components: spec
> Affects Versions: wd15
> Environment: Bruce Bartell wd15 line 706
> Reporter: Bruce Bartell
> Assignee: William Cox
> Fix For: wd17
>
>
> Group should respond on actual requirement. Does Retail DR really have
opt-in programs? Are the remaining items applicable?
> Recommend expanding Option to be equivalent to commit or dispatch
status and revising the service names accordingly.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://tools.oasis-open.org/issues/secure/Administrators.jspa
-
For more information on JIRA, see:
http://www.atlassian.com/software/jira
---------------------------------------------------------------------
To unsubscribe from this mail list, you must leave the OASIS TC that
generates this mail. Follow this link to all your TCs in OASIS at:
https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]