OASIS Open Mailing List Archives  ·  All Lists  ·  energyinterop  ·  2011-07

energyinterop — archive

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]

Deferred Items are now all Open


I have processed all Applied and Resolved issues to Closed as directed in the meeting using the “no-notification” method to minimize jira-spam Following today’s votes, I have moved all Deferred items to Open, again using the “no-notification” method to minimize jira-spam Following these changes, we have 441 Closed issues 28 Open Issues 19 New Issues “The single biggest problem in communication is the illusion that it has taken place.” – George Bernard Shaw. Toby Considine TC9, Inc TC Chair: oBIX & WS-Calendar TC Editor: EMIX, EnergyInterop U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Email: [email protected] Phone: (919)619-2104 http://www.tcnine.com/ blog: www.NewDaedalus.com

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]