OASIS Open Mailing List Archives  ·  All Lists  ·  energyinterop  ·  2011-08

energyinterop — archive

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]

What should be enrolled


I think the list of enrollment types (an enumerated type for EI) is similar to the following designatedDispatchEntity (VTN) distributedEnergyResource loadServingEntity meterAuthority schedulingEntity serviceProvider transportServiceProvider utilityDistributionOperator marketParticipant These second tier entities could be added to the list above, but I think they are redundant. distributionProvider hostBalancingAuthority balancingAuthority independentPowerProducer interchangeAuthority intermediateBalancingAuthority purchasingSellingEntity receivingBalancingAuthority sendingBalancingAuthority transmissionOperator transmissionServiceProvider Changes or suggestions to the list… tc “The single biggest problem in communication is the illusion that it has taken place.” – George Bernard Shaw. Toby Considine TC9, Inc TC Chair: oBIX & WS-Calendar TC Editor: EMIX, EnergyInterop U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Email: [email protected] Phone: (919)619-2104 http://www.tcnine.com/ blog: www.NewDaedalus.com

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]