OASIS Open Mailing List Archives  ·  All Lists  ·  energyinterop  ·  2011-08

energyinterop — archive

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]

FW: EI Section 5 rewrite


Incorporated. "A designer knows he has achieved perfection not when there is nothing left to add, but when there is nothing left to take away." - Antoine de Saint-Exupery Toby Considine TC9, Inc TC Chair: oBIX & WS-Calendar TC Editor: EMIX, EnergyInterop U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Email: [email protected] Phone: (919)619-2104 http://www.tcnine.com/ blog: www.NewDaedalus.com From: Gerald Gray [mailto:[email protected]] Sent: Friday, August 19, 2011 2:00 PM To: Considine, Toby (Campus Services IT) Subject: EI Section 5 rewrite Hi Toby, this is the promised rewrite of section 5.  As suggested by Bill the table that described EiEvent errors has been moved from section 8 to this section, with a generic EiErrorObject described.  (This will need to be added to the EI schema). Cheers - Gerald R. Gray, PhD cell : 517.455.4824 fax : 517.913.6024 Rewrite - section 5 - Introduction to Services and Operations.doc

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]