ubl — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
Re: [ubl] UBL 1.0 draft 5 models and change log (and list of a fewSchema changes)
MHonArc v2.5.0b2 -->ubl message
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Re: [ubl] UBL 1.0 draft 5 models and change log (and list of a fewSchema changes)
- From: Tim McGrath <[email protected]>
- To: Stephen Green <[email protected]>
- Date: Mon, 23 Feb 2004 09:14:53 +0800
i am sorry i have not updated the code list catalog anbd accept it was my action item.
my original plan was to bring it into line with the CCT 'code type' model. that is ensue our models have the data to populate the CCT data type.
i was expecting some feedback on the draft code type model i sent out and i also need to complete reading the code list paper just to make sure they all line up.
i hope to do that this week and will distribute it then.
Stephen Green wrote:
For those who might need these this week I've attachedthe models for draft 5 (including change log).Please note that I've included a Codelist Cataloguespreadsheet which is *not* the most up-to-date (Tim hasapparently sent out a tidied-up version but I don't appear to have it).The only major Schema changes, as far as I can recollect(my Schemas were mainly illustrative and so I haven'tbeen keeping a very detailed log of my Schema changes),since beta were:1. Representation Terms Schema - restrictions, etc removed2. Reusable Schema - split into two, one with just reusedBBIEs (which I've called ReusableBasic but just forillustration for now) and the other with everything else.3. The namespaces for the reusable Schemas changedto include '..CommonAggregateComponents..'and '..CommonBasicComponents..' (new), with prefixescac: and cbc: respectively(I found I could cope with these changes using UBLishquite easily with simple editing of the scripts and thenpost-generation editing in a text editor, so they are nottoo drastic.)I can't remember any other changes apart from changesdue to the changes in the models (see attached change log)Apologies again for a large attachment but I thought itmight be quite a milestone one for the model since wehaven't changed it further this final pre-plenary week.Good luck in Washington those who are there. I hopeto join the calls almost every day.Steve
To unsubscribe from this mailing list (and be removed from the roster of the OASIS TC), go to http://www.oasis-open.org/apps/org/workgroup/ubl/members/leave_workgroup.php.
-- regards tim mcgrath phone: +618 93352228 postal: po box 1289 fremantle western australia 6160
- References:
- UBL 1.0 draft 5 models and change log (and list of a few Schema changes)
- From: "Stephen Green" <[email protected]>
- UBL 1.0 draft 5 models and change log (and list of a few Schema changes)
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]