ubl — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
Minutes of Pacific UBL TC call 3|4 August 2009
MINUTES OF PACIFIC UBL TC MEETING
TUESDAY 4 AUGUST 2009
ATTENDANCE
Jon Bosak (chair)
G. Ken Holman
Andy Schoka
STANDING ITEMS
Additions to the calendar:
http://ubl.xml.org/events
None.
Review of Atlantic call minutes
No comments.
SCHEDULE REVIEW
http://lists.oasis-open.org/archives/ubl/200906/msg00026.html
TSC (AS): Held meeting last week and continued discussion of
Freightwise data models. Expect to hold another work session
this week, including a discussion of requirements for new code
lists.
ACTION: AS to keep TonyC in the loop regarding code list
issues.
GKH: Spreadsheets?
ACTION: JB to ping TM.
AS: TSC will not have ss in time for Montréal.
GKH: We need summary of the new doc types.
ACTION: JB to review current 2.1 doc draft to see what we
have. We know that not all doc types have been identified
yet.
AGREED that we need to add a row in the schedule below current
row 15 for "UBL 2.1 Implementation Guidelines." We will need
resources to actually accomplish this.
ACTION (6/30): TM to circulate a draft CCTS 2.01 DMR to the
TC for review.
Pending.
UBL LATAMLSC FORMATION
JB: Have been in correspondence with Kenneth; he will be
sending a draft charter for further discussion.
UBL 2.1 DOCUMENTATION
JB: Will need help setting up the PDF production environment
(this is already scheduled for the F2F).
CONCEPT OF CODE LIST TEMPLATES FOR UBL 2.1
See
http://lists.oasis-open.org/archives/ubl/200907/msg00021.html
AGREED that we will include the metadata-only gc files in a
separate "templates" directory in the 2.1 package along with an
explanation of their possible use. These will not be pointed
to from the CVA because they are not participating in
validation. This means that for every code list item, there
will either be sets of actual codes in the default directory or
metadata-only files in the templates directory. (In essence,
we are agreeing to GKH's suggestions in the message referenced
above with the exception of his suggestion #2, deciding instead
to include these files rather than omit them.) The
metadata-only files will use the same internal structure used
in 2.0, but will be separated into the templates folder rather
than mixed in with the others. The location URI will reflect
their location in the distribution set. The CEFACT codelists
will be moved into the default directory.
MONTRÉAL MEETING 17-21 AUGUST 2009
The meeting will be held in the downstairs lounge of the Hotel
Europa in Montréal during the week following the Balisage
markup conference (http://www.balisage.net/) in the same
location. The opening plenary will take place at 09:15
Montréal time Monday 17 August 2009. Call-in information is
the same as used for weekly UBL TC calls (see any TC agenda).
GKH will host a Yugma session on his machine; an ID will be
provided by email at the start of the call.
The Montréal meeting marks the completion of outstanding issues
and closure of the door to any data model changes till the next
public review cycle.
Planning to attend in person: JB, GKH, MC, MG, ZR (Mon-Tue)
Planning to attend by phone: TM, PLB, AS, BH, TonyC, AH.
Specific scheduling items:
TM may not be able to attend the opening plenary.
GKH will be delivering a 90 minute presentation to a
corporate client 1500-1630 Tuesday; the group may wish to
attend.
We will be scheduling a call 0930 Wednesday 19 August for a
work session with Freightwise regarding UBL spreadsheets.
People attending in person should plan to meet at 7
p.m. Sunday night 16 August in the lobby of the Europa for
dinner.
Agenda and work assignments (confirmed participants):
Complete UBL 2.0 NDR and prepare for publication (JB, MC,
MG; GKH on call for formatting help)
Complete UBL 2.0 Guidelines for Customization, including
comment review (JB, MC, MG, plus remote participants in
plenary)
Test schema generation (GKH, Oriol, TonyC)
Review initial UBL 2.1 documentation (all)
Review data models etc. to identify materials to be added to
the document in progress (TM, AS, AH, PLB)
2010 UBL TC MEETING SCHEDULE
8-12 February 2010 in Copenhagen, colocated with a PEPPOL
conference 10-11 February. TM to chair.
TC CONCALL SCHEDULE
Week of 10 Aug 2009: >>> TRAVEL <<<
Week of 17 Aug 2009: UBL TC meeting in Montréal
Week of 24 Aug 2009: >>> TRAVEL <<<
Week of 31 Aug 2009: Regular schedule
OTHER BUSINESS
AS: What is analogous to the UN/CEFACT data type catalog for
defining fundamental data types in UBL?
GKH: We use the CCTS 2.01 data types; any of those types are
available to us.
Jon Bosak
Chair, OASIS UBL TC
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]