ubl — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
Minutes of Atlantic UBL TC call 2 September 2009
MINUTES OF ATLANTIC UBL TC MEETING
WEDNESDAY 2 SEPTEMBER 2009
ATTENDANCE
Peter Borresen
Jon Bosak (chair)
Betty Harvey
Tim McGrath (vice chair)
Zarella Rendon
Andy Schoka
STANDING ITEMS
Additions to the calendar:
http://ubl.xml.org/events
None.
Review of Pacific call minutes
No comments.
SCHEDULE REVIEW
PSC (TM): Schema generation is being pushed out and will occur
in two phases as PSC makes two spreadsheet deliveries, one the
week of 21 September and one the week of 12 October. The first
will address the BII extensions and serve as a dry run for the
final deliverable.
ACTION: JB to revise the work schedule with this input from
the PSC meeting last week; try for delivery next week.
TSC (AS): Have been meeting regularly with Freightwise and
working with iSURF to develop the spreadsheets. First group of
three documents will require another 2-3 weeks.
AGREED to aim for TSC delivery in the first set of
spreadsheet deliverables (week of 21 September). This will
require some collaboration with iSURF.
We note that AS will be out of town 14-18 September.
AGREED to schedule Core Component alignment (populating the
appropriate column in the spreadsheets) the week of 19 October
after all the spreadsheets are in.
XADES PROFILE
JB: The SC has produced two drafts of the profile and will now
merge them.
PREPARATION FOR MONTREAL MEETING REVIEW
Note documents to be reviewed before next week's meeting.
MONTREAL MEETING MINUTES
Not done yet; look for message on list.
JB: Will try to have done this weekend.
UBL LATAMRSC FORMATION
http://lists.oasis-open.org/archives/ubl/200604/msg00061.html
JB: Please review the proposed rules and the addition you
will find in the Montreal minutes.
UBL 2.0 GUIDELINES FOR CUSTOMIZATION
http://www.oasis-open.org/committees/download.php/33905/
TM: Update to note that we are not just modifying schemas
(will address this next week).
UBL 2.0 NAMING AND DESIGN RULES
http://www.oasis-open.org/committees/download.php/33904/
JB: Please review.
UBL 2.1 SCHEMA GENERATION
http://www.oasis-open.org/committees/download.php/33945/
JB: This will be the top priority for review next week
because it affects the 2.1 NDR and determines package
structure for the 2.1 deliverable. PLEASE REVIEW.
UBL 2.1 NAMING AND DESIGN RULES
See Montreal minutes (not done yet).
ACTION: JB to forward the 2.1 checklist from Monteal.
UBL 2.1 PACKAGE STRUCTURE
See Montreal minutes (not done yet).
CCTS 2.01 DMR (from Pacific agendas)
ACTION (6/30): TM to circulate a draft CCTS 2.01 DMR to the
TC for review.
Pending.
UBL 2.0 NDR IMPLEMENTATION GUIDE WIKI
ACTION (7/29): JB to edit the formatting of the Extensions
page.
Pending.
2010 UBL TC MEETING SCHEDULE
8-12 February 2010 in Copenhagen, colocated with a PEPPOL
conference 10-11 February. TM to chair.
TC CONCALL SCHEDULE
Week of 2009.09.07: Regular schedule
Week of 2009.09.14: Regular schedule
Week of 2009.09.21: Regular schedule
Week of 2009.09.28: Regular schedule
Week of 2009.10.05: Regular schedule
Week of 2009.10.12: Regular schedule (may cancel Pacific call)
Week of 2009.10.19: Regular schedule
Week of 2009.10.26: Regular schedule
Week of 2009.11.02: Regular schedule
Week of 2009.11.09: Regular schedule
Week of 2009.11.16: Regular schedule
Week of 2009.11.23: Regular schedule (may cancel this, depending)
Week of 2009.11.30: Regular schedule
Jon Bosak
Chair, OASIS UBL TC
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]