ws-calendar — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
RE: [ws-calendar] Terms and Inheritance
I suppose we could switch from Scheduled to Schedulable….but that has offers its own issues.
Other suggestions?
tc
"He who fights with monsters should look to it that he himself does not become a monster, and if you stare long into an abyss, the abyss also stares into you." - Fredrich Nietzche
Toby Considine TC9, Inc
TC Chair: oBIX & WS-Calendar
TC Editor: EMIX, EnergyInterop
U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee
Email:
[email protected]
Phone: (919)619-2104
http://www.tcnine.com/ blog: www.NewDaedalus.com
From:
Mike Douglass [mailto:[email protected]]
Sent: Tuesday, May 10, 2011 9:25 AM
To: [email protected]
Subject: Re: [ws-calendar] Terms and Inheritance
Calendaring has its own sense of scheduling, i.e. scheduling meetings - an event with an organizer and attendees is a scheduling entity. Not sure if it matters but there's a possibility of confusion I guess On 05/10/2011 09:21 AM, Toby Considine wrote:
Several comments call out a blurring between Bound, Partially Bound, Inheritance, Bequeath, Anchored, Unanchored, Unbound, Scheduled, Unscheduled.
Here is what I think:
Anchored – An Interval that is referenced by a Gluon is Anchored. A Sequence that contains an Anchored Interval is Anchored. A Interval can be Anchored and not Scheduled
Bequeath refers to providing values for Binding to a Gluon, Interval or Sequence through a Child relationship.
Inheritance refers to the values Bound to a Gluon, Interval or Sequence from a Parent.
*** refers to the values Bound to an Interval through temporal relations within a Sequence.
Scheduled – An interval is Scheduled if it has two of the three time elements, A Duration, a Start Time, and an End Time. A Scheduled Interval that is Part of a Sequence must have a Duration as one of the two. A Sequence is Scheduled if it contains a Scheduled Interval AND Durations for all Intervals.
Binding is the application of information to an Interval or Gluon, information derived through Inheritance or through ***.
A Bound Element refers to an Element and its Value after Binding.
A Bound Interval refers to an Interval and the values of its Elements after Binding.
A Bound Sequence refers to an Sequence and the values of its Intervals after Binding.
Partially Bound refers to an Interval or a Sequence which is not yet complete after Binding, i.e., the processes cannot yet be executed.
Fully Bound refers to an Interval or Sequences that is complete after Binding, i.e., the process can be unambiguously executed.
Suggestions on ***?
I think these are at last, orthogonal and syntactically complete.
tc
“The single biggest problem in communication is the illusion that it has taken place.” – George Bernard Shaw.
Toby Considine TC9, Inc
TC Chair: oBIX & WS-Calendar
TC Editor: EMIX, EnergyInterop
U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee
Email:
[email protected]
Phone: (919)619-2104
http://www.tcnine.com/ blog: www.NewDaedalus.com
Spam
Not spam
Forget previous vote
--
Mike Douglass [email protected]
Senior Systems Programmer
Communication & Collaboration Technologies 518 276 6780(voice) 2809
(fax)
Rensselaer Polytechnic Institute 110 8th Street,
Troy, NY 12180
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]