OASIS Open Mailing List Archives  ·  All Lists  ·  ws-calendar  ·  2014-08

ws-calendar — archive

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]

UML reveals issue in WS-Calendar PSM


The next PIM working draft with fixes for these and other issues (all the Public Review Comments) will be uploaded tonight. Eyes on the issues Toby mentioned would be good, so we can avoid a second public review before Committee Spec. Thanks! bill -- William Cox Email: [email protected] Web: http://www.CoxSoftwareArchitects.com +1 862 485 3696 mobile +1 908 277 3460 fax On 7/31/14 4:54 PM, Toby Considine wrote: The detailed work of the PIM revealed some flaws in the PSM spec. Notably: The degenerate bound intervals at the heart of FREEBUSY and AVAILABILITY are never adequately defined in the spec or in the Schemas. The RRULES used in Availability are not adequately represented in VAVAILABILITY. If these issues are interesting to you, I urge you to attend the workshop meeting tomorrow to discuss the implications for the PSM. tc Debugging is twice as hard as writing the code in the first place. Therefore, if you write the code as cleverly as possible, you are, by definition, not smart enough to debug it. - Brian W. Kernighan Toby Considine TC9, Inc OASIS TC Chair: oBIX & WS-Calendar OASIS TC Editor: EMIX, Energy Interoperation SGIP Smart Grid Architecture Committee Email: [email protected] Phone: (919)619-2104 http://www.tcnine.com blog: http://www.NewDaedalus.com

[Date Prev]  |  [Thread Prev]  |  [Thread Next]  |  [Date Next]   —  [Date Index]  |  [Thread Index]  |  [Month Index]  |  [List Home]