ws-calendar — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
Fwd: Meeting reminder and how to review PIM WD14 for 20 March meeting
--------
Forwarded Message
--------
Subject:
Meeting reminder and how to review PIM WD14 for 20 March
meeting
Date:
Fri, 20 Mar 2015 09:07:24 -0400
From:
William Cox <[email protected]>
To:
[email protected]
CC:
Michael Douglass <[email protected]>
We have a workshop meeting today at noon Eastern Daylight Time; we
rescheduled for today so Michael would be available.
The philosophy that I've followed with the PIM is to select an
appropriate and useful subset of the expressive capabilities of
RFC 5545 et al + Vavailability. The issues I (and our consumers of
the PIM) have right now is how small is still useful.
The key issues to address at this meeting are IMO
(0) Complete issues related to synchronization with Vavailability
Internet Draft 05 (it's going to Standards Track soon, but that's
our reference).
(1) How much of the recurrence set is necessary for Vavailability?
We started with RRules, and then based on comments added EXDATE
(Exception Dates to the recurrence). RDATE which are recurrence
dates that don't fit a a pattern - and share the same _expression_
as EXDATE. So RRules, Rdate, and Exdate - see section 3.8.5
(p118) of RFC5545 for background for our discussion.
(2) Should recurrence be attached to Gluons? There was a proposal
to apparently add recurrence values to Intervals, which I believe
I mistook from a comment. On further thought, recurrence of
intervals confuses the semantics considerably; one could conceive
of a use for recurrence on a gluon, which effectively shadows the
gluon with a potentially unbounded number of additional gluons
reflecting future instances of a business process. I have mixed
feelings about the value of the this versus the additional
complexity for M2M interpretation, which is another touchstone for
PIM inclusion. Also relates to https://issues.oasis-open.org/browse/WSCALENDAR-555
Thanks!
bill
On 3/13/15 11:45 AM, William Cox
wrote:
I suggest this order for your review of WD14. All links are
public:
The Diffmarked PDF ( https://www.oasis-open.org/committees/download.php/55258/ws-calendar-pim-v1.0-diff-wd14-wrt-wd13.pdf
) 6MB
The Figures only ( https://www.oasis-open.org/committees/download.php/55252/PIM_WD14_Figures.zip
) 1MB
The Clean PDF ( https://www.oasis-open.org/committees/download.php/55259/ws-calendar-pim-v1.0-wd14.pdf
) 5MB
If you use Enterprise Architect, the EAP file ( https://www.oasis-open.org/committees/download.php/55254/PIM_WD14_20150312.eap.zip
) 500K
Changes are fairly well limited, and concentrated in the
Vavailability areas.
You should also look at all non-closed Jira items for PIM; WD14
addresses nearly all of them. Search for issues on component PIM
in states except CLOSED.
Please add comments in Jira as you see fit - that will help the
Workshop meeting on March 20 go faster if we digest the
discussion in advance.
Here are direct links to the items; a bunch are align with
Vavailability Internet Draft 05 and are subissues linked from
WSCALENDAR-541 (and not separately listed here). Most are based
on comments received from Steve Ray on behalf of the ASHRAE
Facility Smart Grid Information Model team, which is doing UML
models for that purpose and is extensively using the PIM CS01,
and most of the rest are based on Toby, Mike, and my reading and
discussion of related issues.
Some of the following are resolved but not applied, e.g. https://issues.oasis-open.org/browse/WSCALENDAR-558
https://issues.oasis-open.org/browse/WSCALENDAR-541
container for 11 subtasks shows as Open because some
subtasks are open
https://issues.oasis-open.org/browse/WSCALENDAR-544
https://issues.oasis-open.org/browse/WSCALENDAR-550
https://issues.oasis-open.org/browse/WSCALENDAR-551
https://issues.oasis-open.org/browse/WSCALENDAR-557
https://issues.oasis-open.org/browse/WSCALENDAR-558
Open and need comments and proposed resolution text:
https://issues.oasis-open.org/browse/WSCALENDAR-540
https://issues.oasis-open.org/browse/WSCALENDAR-555
https://issues.oasis-open.org/browse/WSCALENDAR-563
Thanks!
bill
--
William Cox
Email:
[email protected]
Web:
http://www.CoxSoftwareArchitects.com
+1 862 485 3696 mobile
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]