Streams and Reports and StreamBase
I had a critical realization about Streams when talking with Steve Ray about the use of Streams in FSGIM.
A StreamBase consists of
dtStart
duration
related-to (interval identifier)
Sequence (a set of intervals)
And a Payload
In effect, it is a Gluon and Sequence packaged as one.
A StreamBase can have two uses. It can specify a stream. Or it can describe the computation of the Sequence that will later be conveyed as part of a stream.
If we take the simple case for a Stream, Measure the Temperature at 5 minute intervals starting at 3:00 PM and going through 10:00 PM
Our focus has been on conveying
3:00 PM (dtstart)
5 Minutes (duration)
[01] (related to interval 1)
Room temperature (payload)
01:84 (first interval UID and measurement) (note interval UID can be anything that enables ordering. The actual time is a natural choice)
02:84
03:85
04:85
…
1)
It is perhaps far more useful, to our readers and others, the be able to request the stream reporting, i.e.
3:00 PM (dtstart)
5 Minutes (duration)
[01] (related to interval 1) ß -not needed because implicit
Room temperature (payload)
10:00 PM (dtend)
Is this a stream specifier? If so, it is akin to the ReportSpecifier in Energy Interoperation. I think the Stream is easier to understand if we * start * with the Specifier and then describe the StreamBase
2)
Partitions and Sequences. As written, a Stream can be any sort of Sequence. Is it useful to include any type other than the Partition? If it is not restricted to the Partition, what does it mean? I can imagine a complex Sequence, perhaps measuring a cluster of different items at a scattershot of times, but is it useful?
3)
Temporal Relations. This is a special case of the Sequence discussion. If the measurement sums (for example) some activity over a three minute interval, then would it make sense to convey that “wait 10 minutes and start another sum?”
I know that notions of waiting minutes is the source of a lot of confusion in the FSGIM. They think of a measurement as an instantaneous act separated by durations, while I have always implicitly considered a meter reading as summing the delta over the interval.
tc
“The single biggest problem in communication is the illusion that it has taken place.”
– George Bernard Shaw.
Toby Considine TC9, Inc.
[email protected]
Phone: (919)619-2104
http://www.tc9.com
Chair, OASIS OBIX Technical Committee
Chair, OASIS WS-Calendar Technical Committee
Editor, OASIS Energy Market Information Exchange (EMIX)
Editor, OASIS Energy Interoperation blog:
http://www.NewDaedalus.com