Next in thread → Next in month →

Missing requirements

From
Arnaud Taddei <>
Date
2019-09-17T16:56:00+00:00
ID
Thread
Missing requirements
Thank you Duncan and sorry I was late
hour and I couldn t attend the call 2 weeks ago (am WP3 chairman at ITU-T SG17 and it was WP closing plenary!)



I think we are going to have to spend quite some time on the gap analysis on point 3 from Duncan below before we can even give feedback. But that will produce a lot
  of value in itself



De :
<> au nom de "duncan sfractal.com" <>
  Date :  mardi, 17 septembre 2019 Ã 18:09
  à:  "" <>
  Objet :  [EXT] [cacao] Missing requirements



This is to document my comments at the meeting. I see 4 requirements missing from the slides that got talked about:

Vendor independent interoperability
Agile
break the CACAO work into phases an get  minimum viable product  out sooner rather than later, rather than a  complete  standard taking much
  more time
Use other standards when possible
Give feedback to other standards if they are missing something CACAO needs (specifically OpenC2 as the command and control language is new and needs
  use cases like CACAO to move to it s next phases). Point being (1)use other standard if possible. (2)If it s not possible, see other standard can be changed so it is possible before inventing a new way.

I would like to see these included in the meeting notes as brought up as potentially missing from base set of requirements presented. I m not sure process on reaching consensus on the ones presented or on
  these  additions  (no objections?).



Duncan Sparrell

sFractal Consulting LLC

iPhone, iTypo, iApologize

I welcome VSRE emails. Learn more at  http://vsre.info /
Next in thread → Next in month →