Next in thread →
Next in month →
Re: [dita] Releasing DITA 1.3 in 2014? 2017? 2018?
Kris, et al,
I will be in Singapore next week and unavailable to make the TC call.
I would like to ask about the table accessibility issue: should this be listed as a stage 1 proposal, since it was sent to the list back in March for consideration? Can we vote to move it to Stage 2?
Thanks and best regards,
--Scott
Scott Hudson | PELCO by Schneider Electric | United States | Standards Lead
Phone: +1 970 282 1952 | Mobile: +1 720 369 2433 | Email: | Site: pdn.pelco.com
On May 28, 2013, at 7:43 AM, Kristen James Eberlein <> wrote:
Folks, I've gone through the task of outlining the processes that
we'll need to go through to release DITA 1.3. They are outlined in
the attached PowerPoint slide deck; the key thing to know about is
that it will require a minimum of 25 weeks AFTER we lock down all
the spec content.
I think we are going to have to make some hard choices if we want to
release DITA 1.3 before 2018. Personally, I'd like to see DITA 1.3
released in December 2014, but to be honest, I don't know if it is
possible.
Another thing to be aware of is the work items that will need to be
completed BEFORE we can lock down the spec content. Here is my
current, incomplete list:
Clean up existing SVN repository
Prototype new design for contains and contains by tables
Acquire new tools, if necessary to build contains and contains
by tables
Acquire new tool for zipping up resources used by the spec
Prototype, document, and develop consensus around DITA 1.3
packages
Prototype, document, and develop consensus around information
design for DITA 1.3 specification
Develop build process and scripts
Acquire new licenses for PDF rendering engines (XEP and
Antenna House)
Add new or modified topics to the specification that have been
through the DITA 1.3 process
Incorporate DITA 1.2 errata (see https://wiki.oasis-open.org/dita/DITA1.2Errata)
-- DONE by Eberlein, 22-24 May 2013
Complete spec fixes and clarifications (see
https://trello.com/board/spec-clarifications-improvements/513f5fb5974e438578001a71)
Note that this Trello board does not yet contain items
listed in review #1-3 as being deferred to DITA 1.3)
Complete code fixes (see
https://trello.com/board/dita-1-3-code-fixes/519e8e1dfb386ec417000ae9
)
Edit and rewrite sections of specification that have been
noted as needing this work:
Edit "Configuration, specialization, and constraints"
Redo Coverage of subjectScheme and classification
Redo Coverage of keys
Conduct internal TC reviews of DITA 1.3 content (How many
reviews? How should we best organize them?)
Conduct final internal review of DITA 1.3 packages
--
Best,
Kris
Kristen James Eberlein
Principal consultant, Eberlein Consulting
Co-chair, OASIS DITA Technical Committee
Charter member, OASIS DITA Adoption Committee
www.eberleinconsulting.com
+1 919 682-2290; kriseberlein (skype)
______________________________________________________________________
This email has been scanned by the Symantec Email Security.cloud service.
______________________________________________________________________
<Planning-DITA-1.3.pptx>
---------------------------------------------------------------------
To unsubscribe from this mail list, you must leave the OASIS TC that
generates this mail. Follow this link to all your TCs in OASIS at:
https://www.oasis-open.org/apps/org/workgroup/portal/my_workgroups.php
Next in thread →