← Prev in month
← Prev in thread
Next in thread →
Next in month →
18 Dec. call report
BP and CC PT members, The report of the 18 Dec. joint CC/BP PT conference call is attached. Also the latest version of the project plan and a draft paper on acceptance criteria and change control of delivery team documents. Best regards, Paul Levine (See attached file: BPCC_PT_18Dec2000.doc)(See attached file: BPCC Deliverables v10.2.xls)(See attached file: Acceptance Criteria and Change Control.doc)
← Prev in month
← Prev in thread
Next in thread →
Next in month →