← Prev in month
← Prev in thread
Next in thread →
Next in month →
Comments by Ed Cazalet on energyinterop-1.0-spec-wd-09
Line 314: Transactional energy verification and of contract performance is inherent in the design and is verified by executed forward contracts and interval meter readings. For transactional energy such verification should be in scope. Line 404: "of" should replace "so". Line 713: Please add my name to the list of contributors.
← Prev in month
← Prev in thread
Next in thread →
Next in month →