[OASIS Issue Tracker] Commented: (ENERGYINTEROP-206) Line 323 andSection 5: EI DR DLC approaches not addressed elsewhere in the document

From
OASIS Issues Tracker <>
Date
2010-11-23T19:45:24+00:00
ID
1705271447.96591290541515166.JavaMail.tomcat55@mw00
Thread
[OASIS Issue Tracker] Commented: (ENERGYINTEROP-206) Line 323 andSection 5: EI DR DLC approaches not addressed elsewhere in the document
[ http://tools.oasis-open.org/issues/browse/ENERGYINTEROP-206?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=23684#action_23684 ] 

Bruce Bartell commented on ENERGYINTEROP-206:
---------------------------------------------

Can the deferral be in the form a deferral to another Standards Body? A footnote or section acknowleding that the DLC work is being done elsewhere and EI is deferring to that work?

> Line 323 and Section 5: EI DR DLC approaches not addressed elsewhere in the document
> ------------------------------------------------------------------------------------
>
>                 Key: ENERGYINTEROP-206
>                 URL: http://tools.oasis-open.org/issues/browse/ENERGYINTEROP-206
>             Project: OASIS Energy Interoperation TC
>          Issue Type: Bug
>          Components: spec
>    Affects Versions: wd16
>         Environment: Bruce Bartell wd16 line 323 and section 5
>            Reporter: Bruce Bartell
>            Assignee: Bruce Bartell
>             Fix For: wd18
>
>
> Line 322: "EI also supports demand response approaches ranging from limited direct load control to override-able suggestions to customers."
> Section 5 only has objective based message. Need to add direct load control messages that are sent to Assets.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://tools.oasis-open.org/issues/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira