← Prev in month
← Prev in thread
Changes between PR and CD as submittedq
The Committee Draft as submitted is different in several ways from the Public Review as released. The OASIS staff performed their quality control and removed some non-standard acknowledgements as well as the “Note to Reviewers” page. The note to reviewers included the highlights that the committee requested. <sigh /> tc “It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair. Toby Considine TC9, Inc OASIS Technical Advisory Board TC Chair: oBIX & WS-Calendar TC Editor: EMIX, EnergyInterop U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee Email: Phone: (919)619-2104 http://www.tcnine.com/ blog: www.NewDaedalus.com
← Prev in month
← Prev in thread