Well, I just checked to make sure I uploaded the right stuff…
The Word and the PDF in
CSD URI
http://www.oasis-open.org/apps/org/workgroup/energyinterop/download.php/40425/energyinterop-1-0-spec-cd-01.zip
Each include a listing for the Secretary…
Page 4, after the Notices is “Notes for Reviewers”. The TC voted that the Public Review draft must include internal comments to direct reviewers, to get wider input. It was also noted that the document was likely to be passed around, and not just forwarded as per the cover letter announcing its availability.
tc
"It is the theory that decides what can be observed." - Albert Einstein
Toby Considine
Chair, OASIS oBIX Technical Committee
U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee
Facilities Technology Office
University of North Carolina
Chapel Hill, NC
Email: Toby.Considine@ unc.edu
Phone: (919)962-9073
http://www.oasis-open.org
blog: www.NewDaedalus.com
From: Mary McRae [mailto:]
Sent: Sunday, November 28, 2010 10:54 PM
To:
Cc:
Subject: Re: [energyinterop] Changes between PR and CD as submittedq
Hmmm ... didn't touch any acknowledgements, and the 'note to reviewers' was included in the notice rather than the spec itself?
Mary
On Nov 28, 2010, at 7:24 AM, Toby Considine wrote:
The Committee Draft as submitted is different in several ways from the Public Review as released. The OASIS staff performed their quality control and removed some non-standard acknowledgements as well as the “Note to Reviewers” page. The note to reviewers included the highlights that the committee requested.
<sigh />
tc
“It is difficult to get a man to understand something, when his salary depends upon his not understanding it” -- Upton Sinclair.
Toby Considine
TC9, Inc
OASIS Technical Advisory Board
TC Chair: oBIX & WS-Calendar
TC Editor: EMIX, EnergyInterop
U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee
Email:
Phone: (919)619-2104
http://www.tcnine.com/
blog: www.NewDaedalus.com
CD01 Note.pdf