← Prev in month ← Prev in thread
Next in thread → Next in month →

[OASIS Issue Tracker] Created: (ENERGYINTEROP-351) In EiConstraintthe assocation for notificationInterval and maxEventDuration should beduration, not Sequence; the schedulel should be emix::BusinessSchedule

From
OASIS Issues Tracker <>
Date
2011-03-21T00:11:58+00:00
ID
1363668349.4731300666305147.JavaMail.tomcat55@mw00
Thread
[OASIS Issue Tracker] Created: (ENERGYINTEROP-351) In EiConstraintthe assocation for notificationInterval and maxEventDuration should beduration, not Sequence; the schedulel should be emix::BusinessSchedule
In EiConstraint the assocation for notificationInterval and maxEventDuration should be duration, not Sequence; the schedulel should be emix::BusinessSchedule
-------------------------------------------------------------------------------------------------------------------------------------------------------------

                 Key: ENERGYINTEROP-351
                 URL: http://tools.oasis-open.org/issues/browse/ENERGYINTEROP-351
             Project: OASIS Energy Interoperation TC
          Issue Type: Improvement
    Affects Versions: wd22
         Environment: William Cox
            Reporter: William Cox
            Assignee: William Cox


EiConstraint has two associations to WS-Calendar::Sequence which no longer exists.

The appropriate reference would be to the type duration (XSDsimpleType) and rather than an association these should be attributes in EiConstraint.

For the EiConstraintSchedule the actual schedule should be emix::BusinessScheduleType which is consistent with the EMIX wd19b schemas (thought the type is now EMIX::BusinessScheduleType).


-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://tools.oasis-open.org/issues/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira
← Prev in month ← Prev in thread
Next in thread → Next in month →