RE: [pki-lowercosts] Contractor costing

From
Ross Smith <>
Date
2004-11-02T04:05:40+00:00
ID
Thread
RE: [pki-lowercosts] Contractor costing
David 
- I think it looks fine.  We are all going to have to find the time to 
provide input into the survey.  

 

I am 
curious about the subject line "Contractor Costing".

 

Ross

  
-----Original Message-----
From: Skyberg, David 
  [mailto:]
Sent: Monday, November 01, 2004 
  9:51 AM
To: PKI Lower Costs
Subject: [pki-lowercosts] 
  Contractor costing

  

  
Hi 
  folks,

  
We really need to close on this 
  issue soon.  At our current rate, I don’t see us doing much of anything 
  for the remainder of the year.  We really need to pick up the pace!  
  Here is the list of tasks that we have outlined.  Let’s please all take a 
  moment and flesh these out so that we have what we believe to be a complete 
  set of tasks.  If you don’t have any input for this, then please signal 
  your acceptance by emailing as such to the group.

  

  
 

  
 

  
Draft the 
  survey

  
Work with the sub committee 
  members to draft a survey.  The sub committee will approve the survey 
  before the survey is conducted.

  
-         
  Survey Phase 
  1

  
TC members will be the target of 
  the first phase.  The contractor will conduct the survey with all willing 
  TC members.

  
-         
  Phase 1 
  analysis

  
The contractor will provide 
  analysis of the survey results and coordinate feedback from the TC on the 
  survey itself.

  
-         
  Refine the 
  Survey

  
The contractor will edit and 
  refine the survey based on the feedback from the TC, the analysis of the phase 
  1 results, and guidance from the sub committee.

  
-         
  Identify second phase 
  targets

  
The contractor will coordinate 
  input from the TC as to likely candidates for the second phase survey.  
  The subcommittee will approve the final list.

  
-         
  Survey Phase 
  2

  
The contractor will conduct the 
  survey with representative on both the consumer and producer side of the PKI 
  industry.

  
-         
  Report analysis of 
  results

  
The contractor will report 
  analysis of the results to the sub committee in a format suitable for 
  reporting to both the TC as well as the public