← Prev in month ← Prev in thread

Senate Hearings on Smart Grid - Cyber Security

From
Joe Weiss <>
Date
2009-03-06T02:48:13+00:00
ID
Thread
Senate Hearings on Smart Grid - Cyber Security
I had
an opportunity to listen to the Smart Grid Hearings held March 3 with the
Senate Energy and Natural Resources Committee. NIST Director, Pat Gallagher,
DOE’s Pat Hoffman, FERC Commissioner Kelly,
Commissioner Butler of NARUC, Katherine Hamilton of the GridWise Alliance,
Edward Lu of Google, and Evan Gaddis of NEMA
testified. 
 

  
 

I was
obviously interested in what was being said about cyber security and will focus
on that.  It was gratifying to see that
many presenters and Senators recognized the importance of cyber security. My observations
were:

-  FERC Commissioner Suedeen Kelly stated that NIST
Standards were “good enough” for the Smart Grid. If they are good enough for
the Smart Grid and for all federal agencies including federal utilities such as
TVA, BPA, and WAPA, they should certainly be good enough for the NERC CIPs. She
also made the connection between security and reliability which I thought was
right on. She went on to state the need to coordinate ac ross 
“people” boundaries – FERC (transmission) and NARUC (distribution). Hopefully,
that same approach will be applied to the security of the equipment where the
CIPs currently exclude distribution.
 

- Senator
Dorgan from North Dakota 
mentioned there should be demonstration projects for cyber – again, right on!
 

-
Senators Murkowsky and Cantwell discussed the need for Internet Protocols (IP)
for the Smart Grid which is specifically included in the Stimulus Bill. That
leads to the question of why, if IP is good for Smart Grid applications, have many
utilities been removing IP connections from “non-Smart Grid” transmission
applications? Unfortunately, the answer is obvious - to avoid having to comply
with the NERC CIPs by using the loophole of having to only address routable
protocols.
 

- Based
on the discussions and written testimony (as well as experience with the NERC
CIPs), there is a substantial need for developing good, useable metrics for
really measuring security (see previous blog on compliance vs security).  This is even more important for the Smart Grid
which transcends Transmission and Distribution (T&D) where the CIPS only
partially apply.
 

  
 

Other
non-security observations:
 

- The
focus of the Smart Grid was on T&D and customers and not on power
generation. Consequently, there was no mention of ISA or process controls in
the prepared testimony, presentations, or question/answer sessions.
 

-
NEMA mentioned that consensus standards can be developed in 9-12 months. That
is VERY optimistic. Generally, consensus standards take several years to
develop and get approved. Consensus standards organizations are also voluntary.
Attempting to speed up the development process may take outside funding to
“modify” the voluntary process.
 

  
 

 Joe
 Weiss
← Prev in month ← Prev in thread