Fwd: [smartgrid-discuss] Senate Hearings on Smart Grid - Cyber Security

From
[ary [cQae
Date
2009-03-06T18:35:17+00:00
ID
Thread
Fwd: [smartgrid-discuss] Senate Hearings on Smart Grid - Cyber Security
forwarding messge to proper list - please note smartgrid-discuss is about to be closed. Please adjust your email address books accordingly.

Thanks!

Mary

---------- Forwarded message ----------
From: Benjamin A. Rolfe <>
Date: Fri, Mar 6, 2009 at 1:10 PM

Subject: Re: [smartgrid-discuss] Senate Hearings on Smart Grid - Cyber Security
To: Smartgrid Discussion List <>

Good observations and a couple good 
points. 

 

Developing consensus standards of high 
quality takes time. 9 to 12 months to get to a workable draft is very 
aggressive, with 2 years to get to final draft still pretty 
optimistic.  We can think generally of the process in stages:

1. Establish need and scope (concept 
validation)

2. Develop technical approaches and consensus 
leading to a draft standard

3. Validation of the draft standard within the SDO 

4. Final Approval (which usually involves 
approval by people not involved in development of the draft 
standard)

 

Very often vendors take the risk of implementing 
draft standards during the third phase (while the standard is still being vetted 
inside the SDO) once it looks as though it is fairly stable. This can have mixed 
results, and in several examples in my experience, the overall process of both 
standard completion and market adoption is actually lengthened considerably when 
this is done (if different vendors interpret drafts differently when there are 
still missing bits, and thus produce non-interoperable solutions, the market 
sours on the technology and it can take a while to get over it).  Other 
times it works fine. Deciding when the risk is reasonable takes a lot of 
experience, in depth knowledge of the standard, the process by which it was 
drafted, good timing and a bit of luck (though as a famous golfer once said, the 
more I practice, the luckier I seem to get ;-). 

 

Sometimes if the standard is drafted too quickly 
the overall time to adoption is actually longer, like many things. IMO the 
primary purpose (only purpose?) of standards is to achieve interoperability, and 
strong emphasize of this over all other goals during the drafting process seems 
to help; it may take a bit more time up front but like so many things if spent 
well that time pays back quickly with an overall shorter time to reaching the 
goals. 

 

Another trade-off is that the wider the 
participation, the better the standard, but the more participants 
the longer it takes to reach a true consensus.  The term 'consensus can 
mean different things to different people, even when operating in the same 
SDO with the same rules. It may mean we combine ideas and find a workable 
merged approach, or it might mean I can get more votes than you so I 
win (and many shades between).   I'll agree with Joe that funding 
can help broaden participation (I sure wouldn't mind it ;0), but other outside 
pressures can actually stifle the process.  When consensus is forced both 
quality and schedule can suffer.  

 

One way to accelerate the process is when the SDO 
task group has a very well defined and focused scope. This tends to narrow down 
the options and lead to some obvious 'good enough' points rapidly.   
The better we understand the problem to be solved, the easier that is. The flip 
side of that is that in many cases what we think we know becomes obsolete 
knowledge rapidly, and the problem we think we're solving changes by the time 
we're done; too narrow a view leads to irrelevance. 

 

A recurring theme in SG discussions seems to be a 
fixation on how things have always been done. I think we need to think beyond 
traditional models, because communications technology is an enabler of new ways 
to do things.  I believe technology will alter the barriers and balances to 
new architectures, for example, distributed generation and local storage will 
become viable in places it hasn't been so far, and will completely change the 
game. The work on SG, mostly based 
on what we know to be the rules of the game are today, will be a catalyst that 
will change the rules completely. So how hard can it be to characterize that 
problem?  

 

Just some things to think about as we try to 
maintain useful perspective.

-Ben

  
From: 
  Joe Weiss 
  

  
To: Smartgrid Discussion 
  List 

  
Sent: Thursday, March 05, 2009 6:48 
  PM

  
Subject: [smartgrid-discuss] Senate 
  Hearings on Smart Grid - Cyber Security

  

  

  

  

  

  

  

  
I had an opportunity to listen to the Smart Grid Hearings 
  held March 3 with the Senate Energy and Natural Resources Committee. NIST 
  Director, Pat Gallagher, DOE’s Pat Hoffman, FERC Commissioner Kelly, Commissioner Butler of NARUC, 
  Katherine Hamilton of the GridWise Alliance, Edward Lu of Google, and Evan Gaddis of NEMA testified. 

  
 

  
I was obviously interested in what was being said about 
  cyber security and will focus on that.  It was gratifying to 
  see that many presenters and Senators recognized the importance of cyber 
  security. My observations were:

  
-  FERC Commissioner Suedeen Kelly stated 
  that NIST Standards were “good enough” for the Smart Grid. If they are good 
  enough for the Smart Grid and for all federal agencies including federal 
  utilities such as TVA, BPA, and WAPA, they should certainly be good enough for 
  the NERC CIPs. She also made the connection between security and reliability 
  which I thought was right on. She went on to state the need to coordinate ac 
  ross “people” boundaries – FERC (transmission) and NARUC (distribution). 
  Hopefully, that same approach will be applied to the security of the equipment 
  where the CIPs currently exclude distribution.

  
- Senator Dorgan from North Dakota mentioned there should 
  be demonstration projects for cyber – again, right on!

  
- Senators Murkowsky and Cantwell discussed the need for 
  Internet Protocols (IP) for the Smart Grid which is specifically included in 
  the Stimulus Bill. That leads to the question of why, if IP is good for Smart 
  Grid applications, have many utilities been removing IP connections from 
  “non-Smart Grid” transmission applications? Unfortunately, the answer is 
  obvious - to avoid having to comply with the NERC CIPs by using the loophole 
  of having to only address routable protocols.

  
- Based on the discussions and written testimony (as well 
  as experience with the NERC CIPs), there is a substantial need for developing 
  good, useable metrics for really measuring security (see previous blog on 
  compliance vs security).  This is even more important for 
  the Smart Grid which transcends Transmission and Distribution (T&D) where 
  the CIPS only partially apply.

  
 

  
Other non-security observations:

  
- The focus of the Smart Grid was on T&D and customers 
  and not on power generation. Consequently, there was no mention of ISA or 
  process controls in the prepared testimony, presentations, or question/answer 
  sessions.

  
- NEMA mentioned that consensus standards can be developed 
  in 9-12 months. That is VERY optimistic. Generally, consensus standards take 
  several years to develop and get approved. Consensus standards organizations 
  are also voluntary. Attempting to speed up the development process may take 
  outside funding to “modify” the voluntary process.

  
 

  
Joe Weiss

  
 

-- 
Mary P McRae
Manager of TC Administration, OASIS

voip: 603.232.9090