← Prev in month ← Prev in thread
Next in thread → Next in month →

Need Eyes on Terminology

From
Toby Considine
Date
2011-01-26T16:42:00+00:00
ID
Thread
Need Eyes on Terminology
With Mikes work on Schemas substantially complete, I am crawling through the specification aligning sections with the new terminology. Terms introduced throughout the document are now moving to the top.

Attached is the relevant 4 pages from the draft. Please review and make suggestions and corrections.

tc

“It is difficult to get a man to understand something, when his salary depends upon his not understanding it”

--
Upton Sinclair.
Toby Considine TC9, Inc
OASIS Technical Advisory Board TC Chair: oBIX & WS-Calendar
TC Editor: EMIX, EnergyInterop
U.S. National Inst. of Standards and Tech. Smart Grid Architecture Committee
Email:

Phone: (919)619-2104
http://www.tcnine.com/ blog: www.NewDaedalus.com


Terminology-wd-15-d1.pdf
← Prev in month ← Prev in thread
Next in thread → Next in month →