← Prev in month ← Prev in thread

My edits are done - I hand the pen back

From
Prasad Yendluri <>
Date
2005-08-23T23:01:41+00:00
ID
Thread
My edits are done - I hand the pen back
Folks,

I have incorporated the changes related to resolution of issues 136,
163 and 190. 

136 and 190 require schema changes. 

190: 
Need to add the @exitOnStandardFault
to tProcess and tScope complexTypes.

136: Rename and modify the <switch> schema to match that of the
new <if> activity.

Alex I take you would handle the schema changes.

I also noticed that section 9.3 now occurs prior to section 9.1. We
will need to fix that.

Alex this could have been inadvertent side affect of merging
section 14.1 (Expressions”)  into section 9.1/9.3 (?)

Please check when you have the pen.

Thanks.

Prasad

------- Original Message --------

  
    

      Subject: 
      [wsbpel-spec-edit] Fw: [wsbpel] call Tues Aug 16
    

    

      Date: 
      Tue, 16 Aug 2005 15:33:29 -0400
    

    

      From: 
      Diane Jordan <>
    

    

      To: 
      <>
    

  

Hi,

Thanks to those of you who made the
call today.  To recap where we are:  

Assaf has the pen for  186, 202,
206, 209, 214, 130, 132.  

When he is done, Prasad will take it
for 136, 163 and 190.  

Then, Alex will do 192, 11.1, 111
family
and 92 family (he may take a break between these and let someone else
do
a few).   

We will use email to alert the team
when each completes.   

I know its vacation time which has
impacted
participation.  Hopefully those who are away will return relaxed and
re-energized.  For those of you who aren't on vacation and especially
those from whom we haven't heard lately, please consider volunteering
to
update the spec.  

Following are candidates awaiting an
assignment:

200 (hits sections 12.5.1, text
included
- need to integrate comments) 

210 (sections 13.3.3, 11.1, 10.1, 12.5, 7.2, 9.2, text provided)

213 (sections 6.2, 12.4, schema, text not completely described) 

219 (sections not included.  clarification to be added - text not
provided) 

(note, I've not included  82, 107, 109 since we have other abstract
related issues still open,  or  84 and 105 which seem to be better
done when the spec is fairly complete).

If you've found you no longer have the
ability to participate actively in this subgroup of the TC, please let
me know.  

Regards, Diane

IBM  Emerging Internet Software Standards



(919)254-7221 or 8-444-7221, Mobile: 919-624-5123, Fax 845-491-5709

----- Forwarded by
Diane
Jordan/Raleigh/IBM on 08/16/2005 03:24 PM -----

 

 

Diane Jordan wrote: 

Hi, 

We have a spec editing team call scheduled for tomorrow, Tues Aug. 16
at
12:30 eastern/9:30 pacific.  Call info is:  877-988-8393
int'l 203 566-8013 pc 770954 .

On the last call the following assignments were taken:

Paco: 138, 139, 139.1, 147, 150, 154, 119 and 126. 

Assaf: 186, 202, 206, 209, 214, 130, 132. 

Prasad volunteered by email to do 136, 163 and 190 after Assaf
completes.
  

Paco has finished his updates and handed the pen to Assaf today.  

We can discuss the following candidates for next assignments:    

11.1 (hits 9.4 and schema.  text is provided)  

the 92 group including 192 which has some potential wording
modification
based on the resolution of 92  (hits 6.2, 6.3, schema)

111  (adds section 11.9, text in issue) 

111.1 (6.2, 9.3, schema, text in issue, schema change not there)  

200 (12.5.1, text included - need to integrate comments)

210 (13.3.3, 11.1, 10.1, 12.5, 7.2, 9.2, text provided)

213 (6.2, 12.4, schema, text not completely described) 

219 (clarification to be added - text not provided) 

(note, I've not included  82, 107, 109 since we have other abstract
related issues still open,  or  84 and 105 which seem to be better
done when the spec is fairly complete).   

Regards, Diane

IBM  Emerging Internet Software Standards



(919)254-7221 or 8-444-7221, Mobile: 919-624-5123, Fax 845-491-5709

Diane Jordan wrote:

  Hi,
  

  Thanks to those of you who made the
call today.  To recap where we are:  
  

  Assaf has the pen for  186, 202,
206, 209, 214, 130, 132.  
  

  When he is done, Prasad will take it
for 136, 163 and 190.  
  

  Then, Alex will do 192, 11.1, 111
family
and 92 family (he may take a break between these and let someone else
do
a few).   
  

  We will use email to alert the team
when each completes.   
  

  

  I know its vacation time which has
impacted
participation.  Hopefully those who are away will return relaxed and
re-energized.  For those of you who aren't on vacation and especially
those from whom we haven't heard lately, please consider volunteering
to
update the spec.  
  

  Following are candidates awaiting an
assignment:
  

  200 (hits sections 12.5.1, text
included
- need to integrate comments) 

210 (sections 13.3.3, 11.1, 10.1, 12.5, 7.2, 9.2, text provided)
  

213 (sections 6.2, 12.4, schema, text not completely described) 

219 (sections not included.  clarification to be added - text not
provided) 

(note, I've not included  82, 107, 109 since we have other abstract
related issues still open,  or  84 and 105 which seem to be better
done when the spec is fairly complete).
  

  If you've found you no longer have
the
ability to participate actively in this subgroup of the TC, please let
me know.  
  

  

Regards, Diane

IBM  Emerging Internet Software Standards



(919)254-7221 or 8-444-7221, Mobile: 919-624-5123, Fax 845-491-5709

  
  

  ----- Forwarded by
Diane
Jordan/Raleigh/IBM on 08/16/2005 03:24 PM -----
  

   
  

  

   

  

  

Diane Jordan wrote: 
  

  

Hi, 

We have a spec editing team call scheduled for tomorrow, Tues Aug. 16
at
12:30 eastern/9:30 pacific.  Call info is:  877-988-8393
int'l 203 566-8013 pc 770954 .
  

  

On the last call the following assignments were taken:
  

Paco: 138, 139, 139.1, 147, 150, 154, 119 and 126. 

Assaf: 186, 202, 206, 209, 214, 130, 132. 

Prasad volunteered by email to do 136, 163 and 190 after Assaf
completes.
  

  

Paco has finished his updates and handed the pen to Assaf today.  
  

  

We can discuss the following candidates for next assignments:    
  

11.1 (hits 9.4 and schema.  text is provided)  
  

the 92 group including 192 which has some potential wording
modification
based on the resolution of 92  (hits 6.2, 6.3, schema)
  

111  (adds section 11.9, text in issue) 

111.1 (6.2, 9.3, schema, text in issue, schema change not there)  
  

200 (12.5.1, text included - need to integrate comments)
  

210 (13.3.3, 11.1, 10.1, 12.5, 7.2, 9.2, text provided)
  

213 (6.2, 12.4, schema, text not completely described) 

219 (clarification to be added - text not provided) 

(note, I've not included  82, 107, 109 since we have other abstract
related issues still open,  or  84 and 105 which seem to be better
done when the spec is fairly complete).   

  

Regards, Diane

IBM  Emerging Internet Software Standards

  

(919)254-7221 or 8-444-7221, Mobile: 919-624-5123, Fax 845-491-5709
← Prev in month ← Prev in thread