ws-calendar — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
UML reveals issue in WS-Calendar PSM
Not sure this requires action.
Since Vavailability is a component it implicitly has the interval,
and the rrules (could be wrong here) would similarly have implicit
intervals.
The PIM has to make it explicit, bringing the implicitly understood
context out.
BTW I also looked carefully at the Vavailability draft, and
dtStart/duration is just fine. Anything to reduce the multiplicity
of interval expressions is a step forward IMO.
Thanks!
bill
On 7/31/14 4:54 PM, Toby Considine
wrote:
The detailed work of the PIM revealed some
flaws in the PSM spec. Notably:
The degenerate bound intervals at the heart
of FREEBUSY and AVAILABILITY are never adequately defined in
the spec or in the Schemas.
The RRULES used in Availability are not
adequately represented in VAVAILABILITY.
If these issues are interesting to you, I
urge you to attend the workshop meeting tomorrow to discuss
the implications for the PSM.
tc
Debugging is twice as hard as writing
the code in the first place. Therefore, if you write the
code as cleverly as possible, you are, by definition, not
smart enough to debug it.
-
Brian W. Kernighan
Toby Considine
TC9, Inc
OASIS TC Chair: oBIX &
WS-Calendar
OASIS TC Editor: EMIX, Energy
Interoperation
SGIP
Smart Grid Architecture Committee
Email:
[email protected]
Phone: (919)619-2104
http://www.tcnine.com
blog: http://www.NewDaedalus.com
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]