ws-calendar — archive
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]
Time to pay attention to Jira again - issues addressed in WD11, pending in WD12 - Comments welcome
All
--
You can now start paying attention to Jira messages again - all
issues up to and including WSCALENDAR-524
( https://issues.oasis-open.org/browse/WSCALENDAR-524 ) have been
resolved, applied, and closed.
I've assigned all of of the addressed/closed issues to Toby. Along
the way I entered components in some deferred WS-Calendar 1.0 issues
and linked to the related (e.g. Availability) issues for the PIM.
The new issues are all with respect to WD11, and are marked resolved
pending being applied as I finish my editing for WD12.
525 Enterprise Architect 11 supports XMI 2.4.1; text says that
tooling does not
526 ToleranceType needs clarification of Duration use and
conformance
527 Eliminate XML Schema Type Package from UML Model
528 Model notes must appear in the specification
529 RelationLinkType::gap: DurationType must have correct,
signed, duration
530 ToleranceType needs clarification of Duration use and
conformance
531 Eliminate the UnsignedDurationType, leaving DurationType, and
clarify conformance
532
Vavailability is not fully synchronized with Vavailability Internet
Draft 05
533 Describe the semantics of Vavailability and Availability
534 Delete FreeBusy type and associated classes
535 Compare and contrast TimeRangeType and
AvailabiiltyIntervalType
You can go to
https://issues.oasis-open.org/browse/WSCALENDAR-508?jql=project%20%3D%20WSCALENDAR%20AND%20resolutiondate%20%3E%3D-1w%20ORDER%20BY%20updated%20DESC
(should be WSCALENDAR project, or search advanced for project =
WSCALENDAR AND component = PIM
Thanks!
bill
--
William Cox
Email: [email protected]
Web: http://www.CoxSoftwareArchitects.com
+1 862 485 3696 mobile
+1 908 277 3460 fax
[Date Prev]
| [Thread Prev]
| [Thread Next]
| [Date Next]
— [Date Index]
| [Thread Index]
| [Month Index]
| [List Home]