← Prev in month ← Prev in thread

[OASIS Issue Tracker] (ENERGYINTEROP-719) Power vs Energy

From
OASIS Issues Tracker <>
Date
2022-04-28T02:58:01+00:00
ID
Thread
[OASIS Issue Tracker] (ENERGYINTEROP-719) Power vs Energy
[ https://issues.oasis-open.org/browse/ENERGYINTEROP-719?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

William Cox updated ENERGYINTEROP-719:
--------------------------------------
    Resolution: 
Section 3.2.1 defines Resource Designator as an extensible enumeration as suggested elsewhere.

Market participants use their own conceptual models which continue to include power, energy, and other resouirces.

> Power vs Energy
> ---------------
>
>                 Key: ENERGYINTEROP-719
>                 URL: https://issues.oasis-open.org/browse/ENERGYINTEROP-719
>             Project: OASIS Energy Interoperation TC
>          Issue Type: Bug
>          Components: cts
>    Affects Versions: CTSPR01
>         Environment: Horia Pop; Lateral Inc https://lists.oasis-open.org/archives/energyinterop-comment/202112/msg00001.html
>            Reporter: Toby Considine
>            Assignee: Toby Considine
>            Priority: Major
>              Labels: CLARITY, PREREQ
>
> *Power vs Energy*
> In the initial part of the document both power and energy are referred to as acceptable values for a Resource. Given thereÃs an ongoing confusion between power and energy, I believe the TC should not promote both in the standard as acceptable.ÂTo have any practical TE use energy must always be bound to a unit of time and thus a rate of delivery (power). Whether the power should be levelized or follow an acceptable curve within the interval as defined in [EMIX] thatÃs beyond the scope. The resource that an actor tenders, transacts, delivers, and settles is energy. Power is just an attribute of that energy tender, contract, and delivery.
> _[Lines 11,16,17,229]_



--
This message was sent by Atlassian Jira
(v8.3.3#803004)
← Prev in month ← Prev in thread