Next in thread → Next in month →

RE: Status of e-ballot #3

From
Larry Golding (Myriad Consulting Inc) <>
Date
2019-03-18T22:00:20+00:00
ID
Thread
RE: Status of e-ballot #3
Status as of 2:30 PM 2019-03-18:

 

The following issues will be on the ballot. There are change drafts available for all of them, and they are all
merged into the provisional draft:

 

Issue #179: Introduce toolComponent/driver/extensions (e-ballot: review change draft; design change was previously approved)

Issue #336: toolComponent property changes (e-ballot: review change draft. I have no idea if we pre-approved these individual property changes) (combined change draft with #179)

Issue #337: tool.driver and tool.extensions are externalizable (e-ballot: review design change
and change draft)

 

From:  <>
On Behalf Of Larry Golding (Myriad Consulting Inc)

Sent: Sunday, March 17, 2019 3:58 PM

To: OASIS SARIF TC Discussion List <>

Subject: [sarif] Status of e-ballot #3

 

Here is the up-to-the-minute status of e-ballot #3. This is the ballot that will open this coming Friday. The currently open ballot is #2.

 

The following issues will be on the ballot. There are change drafts available for all of them, and they are all
merged into the provisional draft:

 

Issue #179: Introduce toolComponent/driver/extensions (e-ballot: review change draft; design change was previously approved)

Issue #336: toolComponent property changes (e-ballot: review change draft. I have no idea if we pre-approved these individual property changes) (combined change draft with #179)

 

More to come.

 

Larry
Next in thread → Next in month →