sca-bpel

← back

39 messages · 26 threads

Thread Messages Started
[sca-bpel] [Issue 52] CT generation (section 2.1.1) does not take into consideration the multRefFrom attribute [Alternative proposal based on Partner Link as multi-valued reference] 1 2009-09-01
Re: [sca-bpel] [Issue 52] CT generation (section 2.1.1) does nottake into consideration the multRefFrom attribute [Alternative proposal basedon Partner Link as multi-valued reference] 1 2009-09-02
Groups - Weekly SCA-BPEL telcon modified 6 2009-09-02
Raw minutes from 03-SEP-2009 1 2009-09-03
Formatted minutes of 2009-09-03 telcon 2 2009-09-03
Groups - Minutes of the 2009-08-27 telcon (2009-08-27.html) uploaded 1 2009-09-03
Groups - Action Item Closed: #0105 file an issue about skipping a P... 1 2009-09-07
[NEW ISSUE] Need to add Capability to indicate that a PartnerLink should beignored when introspecting the ComponentType of a BPEL Process 1 2009-09-07
Re: [sca-bpel] [NEW ISSUE] Need to add Capability to indicate that aPartnerLink should be ignored when introspecting the ComponentType of aBPEL Process 3 2009-09-07
Re: [sca-bpel] [NEW ISSUE] Need to add Capability to indicate thata PartnerLink should be ignored when introspecting the ComponentType of aBPEL Process 3 2009-09-08
RE: [sca-bpel] ISSUE 58: Need to add Capability to indicate that aPartnerLink should be ignored when introspecting the ComponentType of a BPELProcess 1 2009-09-09
[sca-bpel] [Issue 52] CT generation (section 2.1.1) does not take into consideration the multRefFrom attribute [Alternative proposal based on Partner Link as multi-valued reference] Version 3. 1 2009-09-09
Formatted minutes of 2009-09-10 telcon 1 2009-09-10
Groups - 2009-09-03.html uploaded 1 2009-09-10
NEW ISSUE: How does a SCA Extended WS-BPEL Runtime deal with a non-conformantBPEL process? 1 2009-09-17
Re: [Issue 59]: How does a SCA Extended WS-BPEL Runtime deal witha non-conformant BPEL process? 1 2009-09-17
[Fwd: Re: [sca-bpel] Groups - Weekly SCA-BPEL telcon modified] 1 2009-09-17
[sca-bpel] Unformatted Minutes of 2009-09-17 TC Call 1 2009-09-17
LOA 3 2009-09-21
Formatted minutes of 2009-09-17 telcon 2 2009-09-22
Groups - Minutes of the 2009-09-10 conf-call (2009-09-10.html) uploaded 1 2009-09-22
Groups - sca-bpel-1.1-spec-cd02-rev3.zip uploaded 1 2009-09-23
Testcases Presentation Slides 1 2009-09-24
Groups - Testcases Description Slides - PDF (Assembly_Testcases_Description.pdf) uploaded 1 2009-09-24
Groups - Testcases Description Slides - ODP (Assembly_Testcases_Description.odp) uploaded 1 2009-09-24
Groups - Action Item Closed: #0107 update XML Schema artifacts in s... 1 2009-09-25