ubl-l10n

← back

25 messages · 7 threads

Thread Messages Started
Re: [ubl-l10n] UBL 2.0 IDD (includes Errata 01) 4 2008-07-07
Re: Slovak UBL translation 7 2008-07-08
[ubl-l10n] Re: IDD fixies 1 2008-07-15
[IDD] Cost Centre (cbc:AccountingCost) 3 2008-07-18
UBL 2.0 Errata 01 IDD rev. 2 6 2008-07-21
[UBL ITLSC] IDD UBL 2.0 PRD 1.3 IT 1 2008-07-21
UBL LSC reports due 3 2008-07-30