The detailed work of the PIM revealed some flaws in the PSM spec. Notably:
The degenerate bound intervals at the heart of FREEBUSY and AVAILABILITY are never adequately defined in the spec or in the Schemas.
The RRULES used in Availability are not adequately represented in VAVAILABILITY.
If these issues are interesting to you, I urge you to attend the workshop meeting tomorrow to discuss the implications for the PSM.
tc
"Debugging is twice as hard as writing the code in the first place. Therefore, if you write the code as cleverly as possible, you are, by definition, not smart enough to debug it."
-
Brian W. Kernighan
Toby Considine TC9, Inc
OASIS TC Chair: oBIX & WS-Calendar
OASIS TC Editor: EMIX, Energy Interoperation
SGIP Smart Grid Architecture Committee
Email:
Phone: (919)619-2104
http://www.tcnine.com blog: http://www.NewDaedalus.com